6.11.3
{{sendMatomoQuery("Sangfor Cloud Platform (SCP)","O&M Guidelines")}}

O&M Guidelines

{{ $t('productDocDetail.updateTime') }}: 2025-12-26
  1. Preparations before the adjustment:
  1. Analyze the current network architecture, including the management network, storage network, VXLAN, and VM network. Confirm the scope of the adjustment, such as whether to change only the storage network IP address.
  1. Send a notification to the business department: Notify them of the time window of the adjustment and the potential impact (such as temporary network disconnection), and prepare for service suspensions.
  1. Adjustment guidelines:

[9]

  1. Guidelines for key scenarios:
  1. Storage network adjustment: Make sure that the storage network interfaces of all nodes use IP addresses that belong to the same network segment. After the adjustment, check whether data in virtual storage is synced.
  1. VXLAN interface adjustment: Adjust the configuration of physical switches at the same time, such as enabling jumbo frames, to avoid VXLAN communication errors.